
The PICO SOL NSOL326 is a one-piece lifting station with a single submersible sewage pump, suitable for releasing sewage back to sewer or systems located at higher elevations. Operation is simplified by the float switch for automatic start/stop.
Learn more in the category: sewage lifting stations.
NSOL326 MAIN SPECIFICATIONS
- Usable volume: 175 L
- Pump power: 0.55 kW
- Impeller: backward
- Flow rate: 0-300 L/min
- Head: 8.5-1 m
- Connections: inlet Ø 110 mm | outlet Ø 50 mm
- Inspection: Ø 400 mm
Pico sol lifting station 175 lt. - 0.55 kw pump

The PICO SOL NSOL326 is a one-piece lifting station with a single submersible sewage pump, suitable for releasing sewage back to sewer or systems located at higher elevations. Operation is simplified by the float switch for automatic start/stop.
Learn more in the category: sewage lifting stations.
NSOL326 MAIN SPECIFICATIONS
- Usable volume: 175 L
- Pump power: 0.55 kW
- Impeller: backward
- Flow rate: 0-300 L/min
- Head: 8.5-1 m
- Connections: inlet Ø 110 mm | outlet Ø 50 mm
- Inspection: Ø 400 mm


PICO SOL NSOL326 is a sewage lifting station with one-piece LLDPE burying tank, PVC inlet with N.B.R. gasket and polyethylene outlet pipe. The submersible pump is equipped with float switch for automatic start/stop.
FEATURES
- One-piece underground structure with single sewage pump.
- Pump with backward impeller, suitable for filthy liquids even with suspended solids.
- Automatic operation by float switch.
EQUIPMENT
- One-piece container made of LLDPE.
- PVC inlet with N.B.R. gasket.
- SM265 submersible pump with float switch.
- Polyethylene outlet pipe.
TECHNICAL DATA (NSOL326)
- Useful volume: 175 L
- Approximate dimensions: Ø 660 mm | H 700 mm | HE 513 mm | HU 490 mm
- Inlet: Ø 110 mm | Outlet: Ø 50 mm | Inspection: Ø 400 mm
- Pump: SM265 | Power: 0.55 kW
- Impeller: backward
- Flow rate: 0-300 L/min | Head: 8.5-1 m


TECHNICAL DRAWING

INSTALLATION (OPERATING DIRECTIONS)
- Excavation with side clearance 20-30 cm (50 cm in heavy soils) and 15-20 cm bed of 20/30 mm washed gravel.
- Fill with water and backfill with 20/30 mm washed gravel in 15-20 cm layers.
- Final cover with non-clayey topsoil (30-40 cm) leaving inspections accessible.
- Venting: open vent + biogas vent connection to suitable elevation (pipe not included).
- Surface loads: heavy sumps/holes on dedicated slab on load-bearing soil.

MAINTENANCE
- Periodic checks on float and pump; keep inspection point accessible.
RECOMMENDED ACCESSORIES
- Biogas vent piping (not included) and finishing components based on surface loads.
- POWER (Kw)
- 0.55
- CAPACITY
- 175
Services that makes difference
24/48H shipping
Ultra-fast shipping with express courier, to offer excellent and timely service to our customers.
Secure payments
We ensure maximum security in online payments through advanced transaction protection systems for the peace of mind of our customers.
Pay in 3 installments with PayPal
Choose the convenience of paying in three interest-free installments with PayPal. An option designed for your financial flexibility.