The PICO SOL NSOL312 is a one-piece sewage lifting station with a single submersible pump equipped with a grinder impeller, suitable when solids reduction and overcoming major height differences are needed. Operation is automatic thanks to the level float switch.
See the full range: sewage lifting stations.
MAIN SPECIFICATIONS NSOL312
- Usable volume: 175 L
- Pump power: 1.18 kW
- Impeller: grinder
- Flow rate: 0-110 L/min
- Head: 30-3 m
- Connections: inlet Ø 110 mm | outlet Ø 63 mm
- Inspection: Ø 400 mm
Pico sol lifting station 175 lt. - 1.18 kw pump impeller grinder

The PICO SOL NSOL312 is a one-piece sewage lifting station with a single submersible pump equipped with a grinder impeller, suitable when solids reduction and overcoming major height differences are needed. Operation is automatic thanks to the level float switch.
See the full range: sewage lifting stations.
MAIN SPECIFICATIONS NSOL312
- Usable volume: 175 L
- Pump power: 1.18 kW
- Impeller: grinder
- Flow rate: 0-110 L/min
- Head: 30-3 m
- Connections: inlet Ø 110 mm | outlet Ø 63 mm
- Inspection: Ø 400 mm


PICO SOL NSOL312 is a sewage lifting station with one-piece LLDPE burying tank, PVC inlet with N.B.R. gasket and polyethylene outlet. The submersible pump is equipped with a float switch for automatic operation and uses shredding impeller, which reduces solids into smaller fragments and allows it to work with high pressures to overcome height differences.
FEATURES
- One-piece underground solution with single grinder pump.
- Suitable for untreated civil wastewater even with suspended solids/filaments.
- Automatic run/stop management by float switch.
EQUIPMENT
- One-piece container made of LLDPE.
- PVC inlet with N.B.R. gasket.
- SM125 submersible pump with float switch.
- Polyethylene outlet pipe.
TECHNICAL DATA (NSOL312)
- Useful volume: 175 L
- Approximate dimensions: Ø 660 mm | H 700 mm | HE 513 mm | HU 490 mm
- Inlet: Ø 110 mm | Outlet: Ø 63 mm | Inspection: Ø 400 mm
- Pump: SM125 | Power: 1.18 kW
- Impeller: grinder
- Flow rate: 0-110 L/min | Head: 30-3 m


TECHNICAL DRAWING

INSTALLATION (OPERATING DIRECTIONS)
- Excavation with flat bottom, side clearance 20-30 cm (50 cm in heavy soils) and 15-20 cm bed of 20/30 mm washed gravel.
- Progressive backfill with water and backfill with 20/30 mm washed gravel in 15-20 cm layers.
- Final cover with non-clay vegetable soil (30-40 cm), leaving inspection plugs free.
- Venting: open vent + biogas vent connection to top of cover (piping not included).
- Heavy manholes/holes on dedicated slab on load-bearing soil.

MAINTENANCE
- Periodic float and pump checks; keep inspection accessible for checking/cleaning.
RECOMMENDED ACCESSORIES
- Biogas vent piping (not included) and finishes/pits based on surface loads.
- POWER (Kw)
- 1.18
- CAPACITY
- 175
Services that makes difference
24/48H shipping
Ultra-fast shipping with express courier, to offer excellent and timely service to our customers.
Secure payments
We ensure maximum security in online payments through advanced transaction protection systems for the peace of mind of our customers.
Pay in 3 installments with PayPal
Choose the convenience of paying in three interest-free installments with PayPal. An option designed for your financial flexibility.