
The PICO SOL SOL526 lifting station is a single submersible sewage pump solution with increased useful volume to handle larger accumulations and reduce startup cycles. The integrated float switch enables simple and reliable automatic management.
Compare the full range: sewage lifting stations.
MAIN SPECIFICATIONS SOL526
- Usable volume: 305 L
- Configuration: single block, single submersible pump
- Pump power: 0.55 kW
- Impeller type: backward
- Flow rate: 0-300 L/min
- Head: 8.5-1 m
- Connections: inlet Ø 110 mm | outlet Ø 50 mm
- Inspection: Ø 400 mm
Pico sol lifting station 305 lt. - 0.55 kw pump

The PICO SOL SOL526 lifting station is a single submersible sewage pump solution with increased useful volume to handle larger accumulations and reduce startup cycles. The integrated float switch enables simple and reliable automatic management.
Compare the full range: sewage lifting stations.
MAIN SPECIFICATIONS SOL526
- Usable volume: 305 L
- Configuration: single block, single submersible pump
- Pump power: 0.55 kW
- Impeller type: backward
- Flow rate: 0-300 L/min
- Head: 8.5-1 m
- Connections: inlet Ø 110 mm | outlet Ø 50 mm
- Inspection: Ø 400 mm


PICO SOL SOL526 is a sewage lifting station with one-piece LLDPE burying tank, PVC inlet pipe with N.B.R. gasket and polyethylene outlet. The single submersible pump with float switch automatically handles run/stop.
FEATURES
- Underground monoblock with single sewage pump.
- Pump with backward impeller for sewage with suspended solids/filaments.
- Automatic management by float switch.
EQUIPMENT
- One-piece LLDPE container for interruption.
- PVC inlet with N.B.R. rubber gasket.
- Submersible electric pump with float switch.
- Polyethylene outlet pipe.
TECHNICAL DATA (SOL526)
- Useful volume: 305 L
- Dimensions: Ø 790 mm | H 790 mm | HE 625 mm | HU 625 mm
- Inlet connection (Ø E): 110 mm
- Outlet connection (Ø U): 50 mm
- Inspection: Ø 400 mm
- Pump: SM265 | Power: 0.55 kW
- Impeller: backward
- Flow rate: 0-300 L/min
- Head: 8.5-1 m


TECHNICAL DRAWING

INSTALLATION (OPERATING DIRECTIONS)
- Recommended upstream primary sedimentation or screening to retain non-grindable bodies.
- Always provide open vent and biogas vent connection (piping not included).

MAINTENANCE
- Periodic maintenance with inlet cleaning and checks on impeller, electrical cable and fasteners.
RECOMMENDED ACCESSORIES
- Primary sedimentation or upstream screening.
- Biogas vent piping (PVC/PP/PE) up to suitable height (piping not included).
- POWER (Kw)
- 0.55
- CAPACITY
- 305
Services that makes difference
24/48H shipping
Ultra-fast shipping with express courier, to offer excellent and timely service to our customers.
Secure payments
We ensure maximum security in online payments through advanced transaction protection systems for the peace of mind of our customers.
Pay in 3 installments with PayPal
Choose the convenience of paying in three interest-free installments with PayPal. An option designed for your financial flexibility.